The new Alex Duetto IV has made it's debut!
The look is the same, but it’s all about the inside! This is what’s new about the IV:
- Inversion of the motor position - The motor has been installed over the pump.
- New PID with shot timer - Timer now integrated into PID.
- Pump adjustment from outside - Thanks to a small cutout in the bottom side panel, it is possible to adjust the pump without dissembling the machine.
- Drain plug in both Boilers - In order to facilitate the drainage of boilers, both boilers have a drain plug in bottom of the machine.
- Heating Element Access - Easy access points in the bottom of the machine, to change the heating elements without dissembling the machine.
- Gicler Valve and Mushroom in stainless steel.
Optional drain kit included
Voltage 110 volt 15 or 20 ampere operational mode
New Now only 15 3/4" tall
- Fulfillment Type:
- Drop Ship